About PiVi

This author has not yet filled in any details.
So far PiVi has created 1504 blog entries.

Choosing a roof colour to suit the façade, windows and setting

First decide which elements of the house will stay unchanged, then match the roof colour to them. In a renovation this may be the brickwork, a stone plinth or the windows; for a new house, prepare a shared set of samples. Check the shade, gloss and texture of the coating in daylight, in sun and shade, and on a formed profile rather than a flat swatch. View the house from the distance it will most often be seen from, and compare the gutter, flashings and soffit. This approach avoids an accidental mix of similar greys or browns.

By |2026-11-15T03:56:25+01:002022-04-09|Knowledge base|Comments Off on Choosing a roof colour to suit the façade, windows and setting

Fibre cement on mono-pitch roofs: simple form, technical limits

A single roof slope gives a simple building form, but it does not remove the technical requirements for the covering. Fibre cement sheets on a mono-pitch roof must be selected to suit the pitch, the drainage length and the degree of enclosure of the building. Asbestos-free fibre cement does not have a single minimum slope for all systems. The top edge, the eaves and the junction with the wall require particular attention. A mono-pitch roof can shelter a small extension or a large hall. These differ in the length of the roof slope and in the quantity of water flowing in one direction. It is worth starting with a measurement of the geometry and with how the building is used. The mere absence of a double-pitch ridge does not mean that all the details will be easy. It also matters whether the roof is free-standing or adjoins a higher wall.

By |2026-11-16T02:19:47+01:002022-04-07|Knowledge base|Comments Off on Fibre cement on mono-pitch roofs: simple form, technical limits

How do you calculate the full cost of covering a 200 m² roof with trapezoidal steel sheet?

In this sample quote, the roof has two rectangular slopes of 100 m² each. Step by step, we determine the number of steel sheet strips, their billing area and the covering cost including flashings. Delivery and installation are considered separately. All rates are agreed net amounts. This calculation shows what is missing from a price given for the material alone. We calculate the actual area of the two slopes, not the building's footprint on the ground. Each slope is 20 m wide along the eaves and 5 m long down the slope. One gives 100 m², both together 200 m². We assume a simple gable roof without dormers, roof valleys or chimneys. The dimensions cover the final covering outline.

By |2026-11-14T12:53:30+01:002022-04-03|Knowledge base|Comments Off on How do you calculate the full cost of covering a 200 m² roof with trapezoidal steel sheet?

Complete connections for steel sections: avoiding gaps between contractors’ responsibilities

One company supplies the main structure, a second the profiles and a third the cladding. Such a division can work smoothly if the scopes meet at clearly described points. Most misunderstandings arise at the connections. Cold-formed profiles require screws, brackets, splice plates and stabilisation selected for the project. It is worth establishing who prepares them before comparing final tender prices. A general phrase such as 'purlin supply' does not say whether it includes the connection to the frame. It may cover just the Z-sections or a complete system with accessories. This must be stated explicitly. It is worth using a drawing of a typical connection detail and assigning the parts to suppliers. Then each party sees what it is responsible for and which element it must connect to.

By |2026-11-15T18:56:29+01:002022-03-30|Knowledge base|Comments Off on Complete connections for steel sections: avoiding gaps between contractors’ responsibilities

Specifying insulation supplies for a farm: separating materials and installation work

It is worth breaking down the purchase of insulation for a farm into specific installation locations and supply scopes. A sandwich wall panel, a roof cladding element and a PIR insulation board for additional insulation are not interchangeable items in a cost estimate. Each should have its own designation, requirements and agreed accessories. Izoprofil.com explains how to prepare a schedule for the supplier, designer and installation team. This guide concerns the organisation of the order: product identification, the boundaries of the works, deliveries and the documents needed at acceptance. It does not replace a structural assessment or a ventilation design. A well-described quote also shows items not included in the price, so that missing flashings or sealing do not appear as a surprise only after the material arrives. The starting point is the approved modernisation scope for each room.

By |2026-11-15T18:59:45+01:002022-03-27|Knowledge base|Comments Off on Specifying insulation supplies for a farm: separating materials and installation work

IKO enertherm KR ALU: budgeting the entire heated floor build-up

IKO enertherm KR ALU is a PIR board with aluminium facing and a printed grid, intended for insulating floors under heating and screed. The budget is not just the price of the board but the whole floor build-up with the same function: installation, separating layers, screed and finish. The PIR thickness affects some of the line items, so a request for quotation should describe the floor build-up and the expected finished result, not just the purchase of material.

By |2026-11-16T02:30:05+01:002022-03-25|Knowledge base|Comments Off on IKO enertherm KR ALU: budgeting the entire heated floor build-up

What to check before ordering tile-effect metal roofing for your house

Before choosing a metal roofing tile, prepare roof plans and sections with the lengths and pitches of each slope, as these let the seller match the format and accessories. Mark windows, chimneys, valleys and wall junctions, and for a renovation describe the existing substrate and planned changes. Also establish who will confirm dimensions before production, and consider access and unloading constraints. Without this information, an order based on the house's general floor area risks shortages and costly reordering.

By |2026-11-15T03:58:11+01:002022-03-19|Knowledge base|Comments Off on What to check before ordering tile-effect metal roofing for your house

Planning chimney flashings on an irregular roof slope

A chimney located in the middle of a simple roof slope is easier to describe than a chimney near a roof valley, a dormer or a change of pitch. In the second case, several water paths and several groups of flashings meet. Their sequence and the way they connect must be established. The chimney flashings should follow from this arrangement. Reproducing a standard set without checking the surroundings can leave a corner that is difficult to seal. It is worth first drawing the section of roof with the chimney and adjacent edges. Mark the ridge, the roof valley and the directions of water flow. Such a view makes it possible to recognise whether water flows in only from a simple slope or also from an additional zone. The width of the chimney alone does not describe these conditions.

By |2026-11-15T03:59:13+01:002022-03-18|Knowledge base|Comments Off on Planning chimney flashings on an irregular roof slope

From a fibre cement roof idea to a clear specification

A good roof idea needs a specification that can be read without guesswork. Fibre cement sheets should be described by their intended use, profile, format and method of installation. Asbestos-free fibre cement is not a sufficiently precise description for an order. The document should combine the desired appearance with the requirements of the structure and of subsequent maintenance. The first part of the specification should state the function, heating and humidity conditions. A house has different needs from a cowshed or an open shelter. Planned changes should also be recorded. The covering should suit the building after completion, not only its current state. Dimensions of the roof slopes, pitches, wall openings and the arrangement of equipment are useful. In the case of renovation, an assessment of the existing structure and the old material must be attached.

By |2026-11-16T02:20:41+01:002022-03-16|Knowledge base|Comments Off on From a fibre cement roof idea to a clear specification

How to determine the thickness of a sandwich panel in a new building project?

The thickness of a sandwich panel results from several checks. Thermal insulation is one of them, alongside load-bearing capacity, fire, moisture and the conditions for making connections. In a new building, the selection should be carried out together with the arrangement of supports and openings. A panel with good U-value will not on its own solve a poorly planned roof-to-wall junction. Record the function of the rooms and the temperatures on both sides of the partition. The wall of a heated workshop, the roof of a warehouse and a cold-storage partition work under different conditions. Add to this humidity, the method of ventilation and fire requirements. Only on this basis are the parameters that the enclosure must meet determined.

By |2026-11-14T12:52:22+01:002022-03-12|Knowledge base|Comments Off on How to determine the thickness of a sandwich panel in a new building project?
Back to top