About PiVi

This author has not yet filled in any details.
So far PiVi has created 1504 blog entries.

Small or large corrugated sheets: how panel divisions affect a building’s appearance

The sheet format affects the appearance of the roof slope, the number of joints and how installation is organised. Fibre cement sheets are best compared in relation to a specific building form. Asbestos-free fibre cement in shorter sheets can produce a finer division, while a large format can emphasise the continuity of the roof. Neither of these effects exempts you from structural requirements. On a small gazebo a large sheet may occupy a considerable part of the visible roof slope. On a vast hall the same format will be just one of many repetitive elements. It is worth assessing how often horizontal laps are to appear. Their rhythm influences the perception of the roof's proportions. There is, however, no rule that a small building always needs a small sheet.

By |2026-11-15T19:00:48+01:002022-03-09|Knowledge base|Comments Off on Small or large corrugated sheets: how panel divisions affect a building’s appearance

Autumn roof checks before the first frost and snowfall

In autumn, first check whether water can drain freely from the roof slope and gutters, because a blockage or choked outlet may only become apparent with the first rainfall. Walk around the building and assess the covering, flashings and signs of damp on the façade below the gutter. Also look in the attic after rain to distinguish fresh moisture from old stains. On that basis, plan repairs before the frost, matched to the type of coating and the conditions recommended by the manufacturer.

By |2026-11-15T03:57:38+01:002022-03-09|Knowledge base|Comments Off on Autumn roof checks before the first frost and snowfall

Five roofing mistakes to look for at handover

The key is to check the entire roof system, not just the appearance of the finished surface. Before acceptance, verify the material selection, the layers beneath the covering, the fixings and the flashings before they are concealed. For T18 and T35 sheet and metal roofing tiles, assess how the coating is handled and whether the covering matches the pitch, supports and loads. The profile designation alone does not determine load capacity – the geometry, steel thickness and support scheme matter. Acceptance should cover detail documentation, leaving design decisions to the designer.

By |2026-11-14T23:58:06+01:002022-03-06|Knowledge base|Comments Off on Five roofing mistakes to look for at handover

Choosing sandwich panels for new cattle, pig and poultry housing

A livestock building requires an enclosure matched to temperature, moisture and the way the animals are kept. The same panel does not have to perform in every room of the farm. In a new cattle shed, pig house or poultry house, the choice of walls and roof should be made together with the ventilation design, washing zones and the layout of equipment. The designer needs information on the purpose of individual rooms, the expected temperature and the amount of moisture. Part of the building may operate with different heating or a different airflow than the adjacent zone. One insulation variant should not be adopted solely on the basis of the name of the entire facility.

By |2026-11-14T12:51:35+01:002022-03-03|Knowledge base|Comments Off on Choosing sandwich panels for new cattle, pig and poultry housing

When is a roof panel suitable above an extension of an older building?

The new part of an older building has its own structure, roof geometry and thermal conditions, but must work together with the existing building. A sandwich panel can help to quickly close the extension. However, success depends above all on the connection between the two parts: the way loads are transferred, water drainage and the continuity of the thermal envelope. Before selecting the panel, check whether the extension has its own supports or uses the existing wall or structure. An assessment of the condition of these elements and calculations for the new arrangement are needed. A visibly solid wall is not proof that it can take additional reactions, especially near former openings and rebuilt sections.

By |2026-11-14T12:54:19+01:002022-02-18|Knowledge base|Comments Off on When is a roof panel suitable above an extension of an older building?

Where does a mineral wool wall help meet the requirements of a new building?

Wall panels with mineral wool can be considered for industrial halls, workshops and buildings accessible to users, but their suitability is determined by the design of the partition. Fire, noise and the connection of the wall to the structure are particularly important. In a new building, these matters are easier to coordinate if the function of each partition is established before the cladding is selected. An enclosing wall closes the building against the weather. A wall with a specified fire resistance performs an additional task that must be demonstrated for the complete solution. Sometimes both tasks fall to the same partition, but this should not be assumed without checking the documentation.

By |2026-11-14T10:37:19+01:002022-02-17|Knowledge base|Comments Off on Where does a mineral wool wall help meet the requirements of a new building?

Choosing materials for a mansard roof

The choice of roofing for a mansard roof depends primarily on the permissible pitches, the fixing method and the details, not on the material alone. Each slope has an upper and a lower part, so the covering must suit both and the break line. Modular metal roofing simplifies work on complex geometry, while cut-to-length sheets work well on simple sections. Before deciding, check the cross-section with actual angles and lengths, the model's approval for both pitches, and the continuity of ventilation and insulation.

By |2026-11-14T20:14:58+01:002022-02-11|Knowledge base|Comments Off on Choosing materials for a mansard roof

How to plan safe snow removal from a roof

The need for snow removal is determined not only by the thickness of the snow cover but primarily by the type of snow, its distribution and the load-bearing capacity of the structure. It is worth checking whether the roof documentation and the conditions for which it was designed are known, especially in large halls. Establishing how to monitor and remove snow before the first heavy snowfall helps avoid improvisation. The assessment should account for drifts at parapets and equipment, as well as ice and water retained by blocked drains. A safe plan should define access, safeguards and the drop zone.

By |2026-11-14T20:12:14+01:002022-02-09|Knowledge base|Comments Off on How to plan safe snow removal from a roof

Roof access systems: where do you need steps and walkways?

A planned roof access route lets you reach chimneys, antennas and equipment that need inspection or repair safely. It consists of steps and walkways mounted on suitable supports, chosen to suit the covering, pitch and purpose. Fixings are best prepared before the roofing work is finished, so that weathertightness is preserved and thin sheet is not loaded unnecessarily. The route should reach the actual service points rather than stop at the easiest place to fit a component. Bear in mind that it does not automatically serve as a fall-protection anchor point.

By |2026-11-14T20:11:09+01:002022-02-03|Knowledge base|Comments Off on Roof access systems: where do you need steps and walkways?

When to choose single-module tile-effect roofing sheets

A single-module sheet of metal roofing can be convenient to transport and lay on complex roof slopes, but it does not guarantee less waste or better tightness. Before deciding, compare the coverage area, the type of seam, the number of fasteners and the total roof cost rather than the price of one sheet. Also check the cutting plan and the availability of matching flashings, because quality depends on the steel, the coating and correct installation, while the number of modules mainly describes the sheet format.

By |2026-11-14T16:51:25+01:002022-01-18|Knowledge base|Comments Off on When to choose single-module tile-effect roofing sheets
Back to top