First grade or outlet: which panel makes sense for a new building envelope?
The choice between first grade and outlet depends on the function of the partition, the type of deviations and batch matching. A low price does not clarify whether the defect is aesthetic or affects the joint and the panel's performance. First define the project requirements, then calculate the saving taking into account the cutting layout, accessories and the number of usable pieces. A partition separating zones with a required fire resistance has different criteria from the cladding of a small unheated warehouse. Likewise, a frontage at the entrance requires a different assessment of appearance from a surface not visible from outside. List the technical and aesthetic requirements separately. Do not weaken the former in order to match the project to a cheaper batch.









