How much does a square metre of sandwich panel cost and what are you really buying?

The price per square metre of a sandwich panel describes a specific product and a method of calculation. It does not yet tell you how much you will pay for the complete set of components or for the finished wall. To assess an offer, you need to combine the rate with dimensions, quality and scope of delivery. A simple calculation allows you to compare the cost per unit, per order and for the enclosure after installation. Ask whether the calculation is based on cover width, overall width or another rule stated in the offer. The cover width defines the module repeated after correct connection of the elements. The part forming the joint does not provide a separate strip of finished wall. Do not count it again as usable area.

By |2026-11-14T12:54:38+01:002025-03-21|Knowledge base|Comments Off on How much does a square metre of sandwich panel cost and what are you really buying?

How do you report a fault on a photovoltaic roof and see the repair through to the end?

A good fault report helps the service team plan the right visit. The owner does not have to determine the cause themselves. They should describe the symptoms, state which system is installed and keep a record of what was agreed. In an integrated roof, the matter may concern both the covering and the electrics. It therefore has to be followed through from the first message until the completed work is confirmed. Delivery of a part alone or a phone call promising a visit does not close it. Give the installation address, the date the problem was noticed and how to make contact. Describe what you see and since when it has been recurring. A precise device message, the location of a stain inside or the times when readings dropped out are helpful. Do not assign blame to the panel or the installer in advance.

By |2026-11-15T18:59:58+01:002025-03-19|Knowledge base|Comments Off on How do you report a fault on a photovoltaic roof and see the repair through to the end?

How metal roofing fits into an energy-efficient house

A metal roof can be a suitable covering for an energy-efficient house, but it does not by itself determine the building's thermal performance. Rather than judging a product by its lambda value, check whether the design ensures continuity of insulation and airtightness across the whole assembly, especially at junctions at the eaves, walls, chimneys and windows. PIR boards above the rafters can reduce layer thickness, but they require proper support and fixing. Choose a board intended for the specific application, not a thin insulating facing. Leave the final layer build-up to the designer, who will select insulation thickness to suit the building's requirements.

By |2026-11-14T16:51:24+01:002025-03-16|Knowledge base|Comments Off on How metal roofing fits into an energy-efficient house

Ordering a prefabricated steel frame for an operating site

Prefabricated components can shorten the route from choosing a solution to delivery on site. For a steel hall to be built efficiently, however, the facility must be ready to receive them. Agreed dimensions, checked site conditions and a defined scope of works are needed. Our standard steel structures can be ordered from available batches. The availability of a specific variant and the collection date are confirmed at the time of order. Our duo-pitch structures cover widths of 8, 10, 12, 14, 16, 18 and 20 m. These are specific series that are worth comparing with the layout of bays or storage areas. A steel hall for warehousing needs space for racking and aisles. In production, access to machinery and the flow of material between process stages are also important.

By |2026-11-15T03:58:57+01:002025-03-05|Knowledge base|Comments Off on Ordering a prefabricated steel frame for an operating site

Six advantages of steel fencing to consider before buying

A steel fence offers considerable freedom of appearance, convenient installation and the ability to adapt the screen to the plot. Before buying, however, check whether the chosen infill type matches the gate and wicket material and whether the coating, edge finish and post construction will ensure durability in everyday use. Also consider visibility at an angle, the effect of wind on posts and foundations, and the possibility of replacing individual elements. Leave final design decisions to the designer and keep the specification for later.

By |2026-11-14T20:13:10+01:002025-03-01|Knowledge base|Comments Off on Six advantages of steel fencing to consider before buying

How should you plan internal insulation with aluminium-faced PIR boards?

Aluminium-faced PIR can restrict vapour flow, but an effective barrier is only created once the boards are joined to the floor, ceiling and windows. With internal insulation, the condition of the wall and its ability to dry out are particularly important. First plan the entire assembly, and only then select the thickness and the method of finishing the interior. At the new-build stage, external insulation usually makes it easier to wrap the wall and structural junctions. Internal insulation is considered where the layout of the plot, façade requirements or zoning restrict other solutions. The decision should cover the entire barrier, not just the available width at the floor.

By |2026-11-14T10:38:17+01:002025-02-24|Knowledge base|Comments Off on How should you plan internal insulation with aluminium-faced PIR boards?

New equipment on a building roof: checking the service conditions of steel sections

A hall roof is often later used for additional installations. These may be equipment, cables, suspensions or items of equipment. Before installing them, it is worth checking the structure. Cold-formed profiles were often selected for a specific set of loads and supports. A new task may change that arrangement. It is not enough to compare the total weight of the installation with the roof area and conclude that the result is small. A purlin plan, cross-sections, thicknesses and material are needed. The connections and bracing are also important. As-built documentation makes it possible to establish whether changes were made compared with the design. If data is missing, the actual structure must be surveyed. Z-sections or C-sections that look similar may have different parameters. Reading the height alone is not enough.

By |2026-11-15T18:58:40+01:002025-02-24|Knowledge base|Comments Off on New equipment on a building roof: checking the service conditions of steel sections

Gutter aprons at exposed and concealed eaves

The eaves line can be strongly emphasised or almost disappear into the building form. In both cases the same problem must be solved. Water from the roof slope must reach the correct drainage path, and the roof layers should remain protected. Gutter aprons are part of this junction. Their appearance and position depend on the entire detail. Concealing the gutter behind a cover does not remove the need for correctly executed flashings. Before choosing a visible trim, it is necessary to know where the gutter is located and how it discharges water. The cross-section should show the covering, substrate, flashings and receiver. It is also worth marking the path of water from beneath the covering, if present. Only this arrangement allows the role of the gutter apron to be determined.

By |2026-11-15T03:59:10+01:002025-02-08|Knowledge base|Comments Off on Gutter aprons at exposed and concealed eaves

What to check on a metal roof after winter

After winter, examine the sheet-metal covering, flashings and drainage before deciding the roof is watertight. Start with safe observations from ground level and from inside the building. Damp marks in the attic, a bent gutter or a displaced component call for the cause to be established. A wet patch does not always mean a hole in the metal — condensation or a blocked outlet may be responsible. Repair should therefore follow diagnosis, and inspection of the roof slope and fixings should be left to a suitably prepared specialist.

By |2026-11-14T20:11:57+01:002025-02-07|Knowledge base|Comments Off on What to check on a metal roof after winter

Installing trapezoidal steel roof sheets from the first sheet to the flashings

Before the sheets go onto the roof, compare the delivery with the order and confirm that the profile, lengths, steel thickness, colour and outer face match the design. Inspect the edges and surface, and report any transport damage immediately. Also check that the flashings, fasteners and seals suit the specific sheet variant. Remember that the names T18 and T35 alone do not define installation requirements. Tightness depends on laps, flashings and correct fixing, so verifying delivery compliance before work starts is essential.

By |2026-11-15T03:57:24+01:002025-02-05|Knowledge base|Comments Off on Installing trapezoidal steel roof sheets from the first sheet to the flashings