What to inspect on a steel building roof after the season
A steel hall roof inspection should not start only after goods have been flooded. A clogged gutter, a loosened flashing or a trace at a new service penetration can signal the need for action earlier. It is worth observing the roof after periods of increased weather loading and in line with the maintenance plan. The visual inspection must be distinguished from the legally required technical inspections. Before work begins, roof drawings, envelope data and the manufacturer's recommendations should be gathered. Information on previous repairs and leak locations is useful. A steel hall may have different solutions in successive sections, especially after an extension. It must not be assumed that the entire roof requires identical treatment.









