Choosing a roofing membrane to suit the roof build-up and loft use

First decide which side of the roof build-up the membrane will serve, rather than relying on a trade name. Check its diffusion resistance, watertightness, strength and the permitted substrate and gaps. Grammage alone does not confirm suitability. For a habitable loft, pay attention to the airtightness of the inner layer; for metal cladding, to drainage and ventilation. Compare the requirements with the cladding instructions and the build-up design. Only then ask about accessories and the compatibility of the whole system.

By |2026-11-15T03:57:27+01:002023-07-10|Knowledge base|Comments Off on Choosing a roofing membrane to suit the roof build-up and loft use

Which sandwich panels should you choose for the walls and roof of a house?

In a residential house, wall and roof panels are meant to form a sealed envelope together, but they perform different tasks. Choosing the core is only part of the decision. Thermal requirements, quiet inside, fire protection and the method of support must be combined. It is best to do this before fixing openings, the eaves and the routing of services. A panel with two metal facings and an insulating core is a different product from a thermal insulation board alone. For the façade, the wall variant is selected, and for the roof slope, the roof variant with the appropriate profile and joint. Whether they can be used in a house depends on the design and the documents for the specific products. The PIR or mineral wool designation alone does not settle this question.

By |2026-11-14T12:54:17+01:002023-06-27|Knowledge base|Comments Off on Which sandwich panels should you choose for the walls and roof of a house?

Which roof covering suits your house?

The choice of roofing is determined above all by the roof pitch, the structure and shape of the roof, and how the attic will be used — not by appearance or price per square metre alone. Check whether the chosen system holds the required approval for the specific pitch, how the substrate and joints are resolved, and whether the trade name really corresponds to the given profile. When replacing a covering, inspect the roof trusses and allow for loads from snow, wind and any photovoltaic installation. Compare two full quotations for the same project, covering flashings, fixings, transport and labour.

By |2026-11-14T16:50:22+01:002023-06-07|Knowledge base|Comments Off on Which roof covering suits your house?

What distinguishes modern modular tile-effect roofing sheets?

Modern modular metal roof tiles stand out for their repeatable sheet format and refined joining method, not for the label ‘new’ alone. Before choosing, check the effective dimensions—the coverage area rather than the overall size—as well as the profile geometry and the type of lock. View several joined sheets in natural light, because a single sample does not show the rhythm of the whole roof slope. Also ask about the permissible roof pitch and the details at the eaves. A flat profile does not remove the need for an even substructure, and a deeper pressing is not automatically better.

By |2026-11-14T16:51:41+01:002023-05-29|Knowledge base|Comments Off on What distinguishes modern modular tile-effect roofing sheets?

Which PIR board under render suits a house built from aerated concrete?

Aerated concrete can provide a significant part of a wall's thermal resistance, so the insulation is matched to the specific type of masonry. For a rendered façade, the compatibility of the PIR board with the whole system is equally important. A favourable lambda is not enough if the substrate, render, adhesive and fixings have not been planned as one assembly. The width of the block alone does not indicate its thermal performance. Density, thermal parameters and the jointing technology matter. The calculations require data specific to the actual wall layer, not a general 'aerated concrete' entry. A different type of the material at the same thickness will give a different resistance.

By |2026-11-14T10:38:33+01:002023-05-28|Knowledge base|Comments Off on Which PIR board under render suits a house built from aerated concrete?

Changing the use of a steel building – checks before operations change

A steel hall that has served well as a warehouse is not automatically suitable for a workshop or production facility. New operations may change loads, moisture levels, vehicle traffic and fire requirements. Before buying machinery, it is worth comparing current conditions with the needs of the planned process. Relocating equipment should follow from this assessment, not precede it. The term “new tenant” alone says little about the building. What is needed is information about the work, the number of people, materials and equipment. In a steel hall, the duration of use of individual zones also matters. Occasional access to goods is assessed differently from permanent workstations.

By |2026-11-15T03:58:54+01:002023-05-23|Knowledge base|Comments Off on Changing the use of a steel building – checks before operations change

What needs to be checked for a PIR panel roof to meet fire requirements?

A PIR roof panel cannot be assessed with the single word "fire-resistant". A roof has different tasks in a fire, depending on the direction of exposure and the function of the building. The appropriate classifications are needed for the specific configuration. In a new project, these must be checked together with the support spacing, skylights, penetrations and the load-bearing structure. First, the designer determines what criteria the roof must meet in the given building. This does not follow solely from its area or the name of the core. The function of the building, the structure and the adopted fire protection solutions are significant.

By |2026-11-14T12:54:35+01:002023-05-17|Knowledge base|Comments Off on What needs to be checked for a PIR panel roof to meet fire requirements?

What does the price of an Oborniki panel include and which type should you choose for a new hall?

When pricing a hall, the term “Oborniki panel” requires clarification. The seller needs information on the core, thickness, facings and installation location. Each of these decisions can change the cost and the method of constructing the envelope. See how to move from a colloquial name to a set of panels and accessories that can be reliably compared with another offer. Most often it refers to a composite panel in which the insulating core sits between facings. In metal versions, both sides are usually steel sheet, but the word “Oborniki” alone does not guarantee a specific construction. The exact product type and its intended use should be specified.

By |2026-11-14T12:52:57+01:002023-05-15|Knowledge base|Comments Off on What does the price of an Oborniki panel include and which type should you choose for a new hall?

What changes when you choose 150 or 200 mm mineral wool panels in a wall design?

Moving from 150 to 200 mm increases the core thickness, but also changes the weight, the reveal depth and the length of the joints. The benefits must be related to the specific panel family and the function of the wall. In a new building it is easier to use a thicker panel when its impact on the fenestration, structure and flashings is planned before these elements are installed. For an example wall panel with concealed fixing and 0.5/0.5 mm facings, the 150 mm variant has Uc 0.27 W/(m²·K) and a weight of 23.4 kg/m². In the same family the 200 mm variant has Uc 0.20 W/(m²·K) and a weight of 28.4 kg/m². The change in weight is therefore 5 kg/m².

By |2026-11-14T10:37:49+01:002023-05-13|Knowledge base|Comments Off on What changes when you choose 150 or 200 mm mineral wool panels in a wall design?

How to calculate roof costs and spot gaps in a quotation

To calculate the cost of a roof, start by measuring the roof slopes and listing all the layers, not from the price of sheet metal per square metre. Check whether the offer refers to total area, effective coverage or a single sheet, because without this, comparing amounts leads to the wrong choice. Include eaves, ridges, valleys, chimneys and roof penetrations in the schedule, as these often increase labour costs more than extra metres of simple covering. Before ordering, measure the completed structure, since differences between design and construction can change sheet lengths and the number of flashings.

By |2026-11-14T16:50:21+01:002023-05-09|Knowledge base|Comments Off on How to calculate roof costs and spot gaps in a quotation