About PiVi

This author has not yet filled in any details.
So far PiVi has created 1404 blog entries.

Why is a new metal roof leaking? Eight places to check

A wet patch under a new roof does not have to mean faulty sheet metal. Water can get in through a joint, flashing or a hole left after installing services. Sometimes it comes from condensation on the inside of the covering. It is worth tracing its path before starting a repair. The place where it drips can be some distance from where the problem started. The first cause is a roof pitch lower than that permitted for the chosen system. Water then flows differently from what the joint detail assumes. The length of the slope and the presence of transverse joints also matter. The name ‘trapezoidal’ or ‘standing seam’ alone does not define the permitted fall.

By |2026-11-14T10:33:02+01:002025-06-18|Knowledge base|Comments Off on Why is a new metal roof leaking? Eight places to check

How coatings affect the life and appearance of tile-effect steel roofing

A metal roof tile owes its durability and appearance to the full coating system, not the outer paint alone. Colour and texture are only the finish: beneath them sit the steel core, metallic protection and layers that prepare the substrate and form the organic coating. Each has its own job, so judging a product by gloss or micrometre count can mislead. What matters is the type of protection, resistance to corrosion and sunlight, service conditions, and the complete material the profile was made from. Installation and maintenance also shape durability.

By |2026-11-14T20:14:24+01:002025-06-10|Knowledge base|Comments Off on How coatings affect the life and appearance of tile-effect steel roofing

What roof battens do and how their spacing is determined

Roof battens provide direct support and fixing points for the covering, so their layout must be decided before installation rather than corrected during the work. Instead of generic recommendations, check the spacing required by the instructions for the specific product and the cross-section determined by structural conditions. The first batten at the eaves is especially important, as it governs support for the start of the sheet and drainage into the gutter. Counter-battens, running along the slope, serve a different purpose and help create the ventilation space. Before fixing the whole framework, it is worth trialling a section of covering with the eaves components.

By |2026-11-14T16:50:52+01:002025-06-09|Knowledge base|Comments Off on What roof battens do and how their spacing is determined

Parapet cappings on modern buildings – detailing a clean roof edge

On a building with a simple form, the top edge of the façade is very distinct. Parapet flashing can form a thin line or a stronger band. In both cases it must protect the wall and drain water in accordance with the design. The fewer elements visible on the façade, the easier it is to notice uneven joints and arbitrary terminations. That is why a restrained appearance should be based on a precise section, careful support and planned connections. The height of the visible leg influences the proportions of the wall's crowning. A narrow band can almost disappear, while a wider one emphasises the outline of the form. The choice should be checked in a view of the whole building. It will be perceived differently above a large hall than above a small commercial building.

By |2026-11-15T03:59:25+01:002025-06-02|Knowledge base|Comments Off on Parapet cappings on modern buildings – detailing a clean roof edge

What work does a roofer carry out and take responsibility for?

A roofer is responsible above all for the roof covering and the details that protect the building from precipitation, not merely for fixing the sheets. Before work begins, check whether the contract clearly separates carpentry work on the roof structure from roofing work, that is, preparation of the substrate, protective layers and the covering itself. The scope depends on the contract and the team's competence, so one company may carry out both stages, but this should not be assumed without agreement. It is also worth asking who is responsible for assessing the substrate and any consultation with the designer.

By |2026-11-14T16:50:35+01:002025-05-27|Knowledge base|Comments Off on What work does a roofer carry out and take responsibility for?

How to set the schedule and payments for a photovoltaic roof?

A roof-integrated system requires coordination of design, delivery, roofing and electrical work. The schedule should show their dependencies, and payments should refer to clearly described stages. The mere date of material arrival does not mean a ready energy source. It is worth separating the completion of the weathertight covering, the commissioning of the installation and the handover of documents. This way both parties know what is to be done and when the completion of the scope can be confirmed. First, the geometry, the layout of the active fields and the required details must be confirmed. It is also worth settling the fundamental selection of equipment and routes. A change to a window, chimney or roof slope dimension after ordering may affect the prepared components. Therefore the schedule should provide for the moment of design approval, not just the start date of works.

By |2026-11-15T19:00:25+01:002025-05-20|Knowledge base|Comments Off on How to set the schedule and payments for a photovoltaic roof?

How do you use the PIR calculator to match the thickness to the actual wall?

The PIR thickness calculator is useful for comparing options if it describes the wall you actually intend to build. The most common mistakes concern units, the properties of the masonry and omitting the facings. It is worth treating the calculation as the first stage of selection and then checking moisture, junctions and the compliance of the whole solution. Entering a random U-value into the form can lead to choosing insulation that is too thin or unnecessarily thick. The target follows from the function of the building, the operating temperature and the adopted requirements. A wall in a flat is analysed differently from a partition between a warm workshop and a cool store.

By |2026-11-14T10:38:40+01:002025-05-11|Knowledge base|Comments Off on How do you use the PIR calculator to match the thickness to the actual wall?

PVC or metal soffits: choosing an eaves finish and estimating its cost

When choosing soffit, first decide whether the priority is the lightness and flexibility of PVC or a colour match between coated steel and the roof tiles and flashings. Check whether the product's conditions of use cover dark colours and sun exposure, and examine the rigidity of a sample and the availability of ventilated components. Remember that the air inlet must match the roof layer build-up, and the openings must not be covered with airtight foil. Calculate cost with trims, corners, framework and installation, not just square metres of panel.

By |2026-11-14T23:58:23+01:002025-05-10|Knowledge base|Comments Off on PVC or metal soffits: choosing an eaves finish and estimating its cost

What determines the cost of a tile-effect metal roof?

The price of tile-effect metal roofing depends on the material, coating, format and the quantity needed for a specific roof. Two rates per metre may refer to different areas. With modules, pricing is per piece. Before you compare quotes, convert them to the same unit and add the elements without which a complete covering cannot be made. A quote may show a total square metre, an effective square metre or the price of one module. The effective area describes the coverage after the elements are joined. The total area also includes the parts that go into the laps. You should not multiply the price per total square metre by the roof slope area without checking the layout.

By |2026-11-14T10:36:38+01:002025-05-03|Knowledge base|Comments Off on What determines the cost of a tile-effect metal roof?

How timber beams are joined in a roof frame

The way beams are connected depends primarily on the forces, geometry and location within the structure. Joining two lengths is different from connecting a rafter to a support. It is worth checking what forces the node must transfer and whether the joint matches the structural drawing. Cross-section, timber grade and moisture conditions must be considered. Merely butting two beam ends together does not restore continuity. Load capacity is determined by the whole detail, not by a number of random screws. That is why a carpenter needs a design, not just a photo from a neighbouring site.

By |2026-11-14T23:56:44+01:002025-05-03|Knowledge base|Comments Off on How timber beams are joined in a roof frame
Back to top