Knowledge base
Izoprofil.com helps you compare materials for a specific building project. The guides cover the uses of sandwich panels, PIR insulation boards, metal roof tiles and trapezoidal sheets. The criteria depend on the application, including the supporting structure, thermal performance and requirements for the finished surface. Read the product specifications, identify which dimensions affect the order and compare complete solutions. The articles help you discuss the options with a designer or installer and check the suitability of the selected materials before purchase.
How to restore the appearance of a metal roof
First work out what is spoiling the metal roof's appearance: dirt, a surface layer, rust or a bent sheet. Assess it from somewhere you can stand securely, checking where discolouration clusters, where water runs off and whether the sheet edges are damaged. Contamination close to trees may look unlike that near a chimney. A rusty dot can be leftover filings, yet it may also mean the protective layer has been breached. Identify the cause before choosing painting or replacement.
Choosing a roof colour to suit the façade, windows and setting
First decide which elements of the house will stay unchanged, then match the roof colour to them. In a renovation this may be the brickwork, a stone plinth or the windows; for a new house, prepare a shared set of samples. Check the shade, gloss and texture of the coating in daylight, in sun and shade, and on a formed profile rather than a flat swatch. View the house from the distance it will most often be seen from, and compare the gutter, flashings and soffit. This approach avoids an accidental mix of similar greys or browns.
Fibre cement on mono-pitch roofs: simple form, technical limits
A single roof slope gives a simple building form, but it does not remove the technical requirements for the covering. Fibre cement sheets on a mono-pitch roof must be selected to suit the pitch, the drainage length and the degree of enclosure of the building. Asbestos-free fibre cement does not have a single minimum slope for all systems. The top edge, the eaves and the junction with the wall require particular attention. A mono-pitch roof can shelter a small extension or a large hall. These differ in the length of the roof slope and in the quantity of water flowing in one direction. It is worth starting with a measurement of the geometry and with how the building is used. The mere absence of a double-pitch ridge does not mean that all the details will be easy. It also matters whether the roof is free-standing or adjoins a higher wall.
How do you calculate the full cost of covering a 200 m² roof with trapezoidal steel sheet?
In this sample quote, the roof has two rectangular slopes of 100 m² each. Step by step, we determine the number of steel sheet strips, their billing area and the covering cost including flashings. Delivery and installation are considered separately. All rates are agreed net amounts. This calculation shows what is missing from a price given for the material alone. We calculate the actual area of the two slopes, not the building's footprint on the ground. Each slope is 20 m wide along the eaves and 5 m long down the slope. One gives 100 m², both together 200 m². We assume a simple gable roof without dormers, roof valleys or chimneys. The dimensions cover the final covering outline.
Complete connections for steel sections: avoiding gaps between contractors’ responsibilities
One company supplies the main structure, a second the profiles and a third the cladding. Such a division can work smoothly if the scopes meet at clearly described points. Most misunderstandings arise at the connections. Cold-formed profiles require screws, brackets, splice plates and stabilisation selected for the project. It is worth establishing who prepares them before comparing final tender prices. A general phrase such as 'purlin supply' does not say whether it includes the connection to the frame. It may cover just the Z-sections or a complete system with accessories. This must be stated explicitly. It is worth using a drawing of a typical connection detail and assigning the parts to suppliers. Then each party sees what it is responsible for and which element it must connect to.
Buying swissporPIR Alu: compare thermal resistance and scope of delivery
Buying swissporPIR Alu requires comparing the material price with the work that will produce the finished building element. A lower board height can affect edge details and levels, but its value must be confirmed by the drawing and the full scope of execution. The product has a rigid polyisocyanurate foam core and a gas-tight laminate on both sides; the manufacturer lists aluminium, paper and polyethylene in the facing. The broader terms “polyurethane boards” and “polyurethane foam” do not replace the precise PIR designation. In an enquiry about delivery, specify swissporPIR Alu as a thermal insulation board with an aluminium, paper and polyethylene laminate, distinguishing it from the steel facing of a structural sandwich panel.





