PIR insulation
SOPREMA EFYOS BLUE A: how to compare the cost of complete thermal insulation
Thermal insulation of a flat roof under EFYOS BLUE A waterproofing must be priced as a complete solution, not as the square metres of the board alone. Two quotations for the same thickness may differ in format or edge type, so the common basis is the actual coverage area. The termination of the thermal insulation at the parapet is a difficult detail, so it is worth attaching to the enquiry a parapet section with the level markings of all layers and a measurement of the parapet height above the target covering surface. Without this, the supplier is guessing the scope, and a lower material figure may relate to a smaller part of the finished work.

The subject of the purchase must be unambiguous
The thermal layer must fit within the building envelope and leave the waterproofing with a correct termination. The junctions in the roof cross-section should be clarified by the designer before the quotations are compared on the basis of the final amount.
The correct product and the scope of its data
In the EFYOS BLUE A specification, the product must be described, not just the type of insulation. The board has a PIR core and aluminium facings on both sides with a thickness of 50 μm; the declared λD is 0.022 W/(m·K), and the RD for 100 mm is 4.50 m²K/W, for 120 mm — 5.45 m²K/W. The product has a CS(10/Y)120 level and reaction-to-fire class E. The data sheet permits straight or milled edges, so the external format alone does not determine the coverage area. At acceptance, the full name EFYOS BLUE A must match the order, and the properties relate to the complete board including the facings, not the core alone.
A uniform basis for calculation
For 40 m², the volume of the 100 mm layer is 4.00 m³, and of the 120 mm layer 4.80 m³. This does not mean a proportional difference in the price of EFYOS BLUE A: the rates for specific thicknesses, packaging and cutting are read from the quotations. The lambda of 0.022 W/(m·K) serves for thermal assessment, not for converting the price list. In the purchase comparison, also state the edges and the effective coverage area.
The low lambda of 0.022 W/(m·K) helps to select the thickness of EFYOS BLUE A, but does not confirm that the entire roof will fit below the parapet flashing. Comparing quotations requires a cross-section with the elevations of the insulation, slopes and covering. The cost of any change to the flashing should be visible next to the price of the boards before the delivery is ordered.
What changes the cost of the solution
Increasing the board thickness and refining the junction at the roof perimeter are two different scopes of work. At the termination of the thermal insulation at the parapet, the consequences of each decision must be set out, because allocating the entire available height to insulation changes the assumptions of the cost estimate. Differences in the cross-section are confirmed by the designer of the roof cross-section, and choosing the cheaper item makes sense only after they have been clarified. The scope is organised by a schedule of thicknesses, edges and covering areas.
Labour hidden in the joint
The aluminium facing of EFYOS BLUE A is the surface in contact with the subsequent layers. The cost estimate should indicate the connection materials in accordance with the documentation and the method of protecting the terminations at the parapet. Before covering, it is worth recording the board designation and photographing the completed joints; the scope of acceptance and the responsible person must be established in advance.
Transport, allowance and preparation
The cost estimate for EFYOS BLUE A does not end with the price of the material delivered to the construction site. It must indicate who provides the support for the boards with the load-distributing layer and prepares the working position, and the order quantity should be based on the schedule of thicknesses, edges and covering areas. In the schedule, allow for the waterproofing covering above the board, because the waiting time may increase the cost of protection; a change to the height limit at the flashing requires the number of elements to be recalculated. Then the polyurethane insulation has a fully calculated scope, comprising the thermal layer and the correct termination of the waterproofing.
Conditions for accepting the final quote
The offer for EFYOS BLUE A must correspond to the parapet cross-section with the levels of all layers. At acceptance, record the thickness and edge variant from the label, so that the documents do not describe a different variant from the delivery. Also establish the settlement of changes at the termination of the thermal insulation at the parapet and check the completeness of the scope before signing. When a substitution is proposed, compare the level of the covering with the flashing drawing; the scope of thermal insulation of the flat roof under the waterproofing is to remain consistent with the objective regardless of the order of purchases. PIR boards therefore form part of a comparable offer, where the saving results from good selection, not from omitting work.