PIR insulation
IKO enertherm KR ALU: budgeting the entire heated floor build-up
IKO enertherm KR ALU is a PIR board with aluminium facing and a printed grid, intended for insulating floors under heating and screed. The budget is not just the price of the board but the whole floor build-up with the same function: installation, separating layers, screed and finish. The PIR thickness affects some of the line items, so a request for quotation should describe the floor build-up and the expected finished result, not just the purchase of material.

The subject of purchase must be unambiguous
Measuring from the substrate to the finished floor establishes the actual scope of supply and works instead of leaving it to guesswork. The aim is to limit downward heat flow while retaining the full floor cross-section. The floor and heating designer settles the joints and service penetrations before quotations are compared on the basis of the final amount.
The correct product and the scope of its data
In a heated-floor specification, identify IKO enertherm KR ALU by its PIR core and the printed grid on the aluminium facing. The declared lambda of 0.022 W/(m·K) and the compressive stress of at least 150 kPa at 10% deformation apply to the finished product, as do RD 3.60 m²K/W for 80 mm and 4.50 m²K/W for 100 mm; the reaction to fire is class F. Floor insulation and the selection of the heating installation remain separate tasks, which is why in the order the full name IKO enertherm KR ALU replaces the general term polyurethane boards. The core is PIR-type polyurethane foam, and the properties of the complete board also include its facings; insulation with polyurethane here means installing factory-made boards in a defined layer arrangement.
A uniform basis for calculation
For 100 m², a 100 mm layer gives 10.00 m³, and 120 mm gives 12.00 m³. This difference in volume does not translate directly into the price of IKO enertherm KR ALU: the rates for the given thicknesses, packaging and cutting follow from the quotations. The price of a single board is therefore not multiplied in proportion to the thickness. The aluminium surface with printed grid also matters, and the quotation is organised by the schedule of insulation, separating layers and floor construction.
In IKO enertherm KR ALU, the aluminium surface with printed grid is a product element that must be set against the height budget for insulation, installation, screed and finish. The floor cross-section at the threshold with the layer thicknesses shown separately indicates what the assumption relates to. The schedule of insulation, separating layers and floor construction should reflect the variant resulting from the thermal requirements, the support and the floor load, and not the price of the board alone.
What changes the cost of the solution
For IKO enertherm KR ALU, select the insulation thickness from the required thermal resistance, then check the finished floor level at thresholds and service penetrations. If there is insufficient height, agree changes to the build-up with the floor and heating designers; do not reduce the screed thickness without their approval. The quotation should show whether the adjustment requires different insulation, additional substrate preparation or altered levels in adjacent rooms.
Labour hidden in the joint
The grid on the KR ALU laminate helps plan the works, but does not replace the heating system design. In the quotation, separate the laying and the required sealing of the boards from the installation of the heating and the screed. Before covering, check the insulation markings, the cross-section at thresholds and the conformity of the installation routing with the design.
Transport, allowance and preparation
In the KR ALU budget, include the preparation of the substrate and the load-distributing layer in accordance with the floor design. The schedule should indicate the sequence for laying the insulation, the installation and the screed. A change in insulation thickness requires checking the entire height balance and updating the order and the quotation for the dependent works.
Conditions for accepting the final quote
Base the settlement of the threshold and service penetrations on the approved floor cross-section. If a replacement with KR ALU is proposed, check the thermal resistance, the support and the floor load, as well as conformity with the heating layout. The acceptance report should separately confirm the product supplied and the works that the screed will later cover.