BauderPIR M/MF as an alternative: what to compare in quotations

At a glance

BauderPIR M and MF should be compared with other boards as part of an agreed roof build-up. The mineral facing, the edge geometry and the lambda value for the ordered thickness all influence the choice of covering and the scope of works. It is not enough to swap the product name in a bill of quantities written for an aluminium-faced board: the required thermal resistance, the layer heights and the compatibility of the waterproofing must all be checked. Include the M or MF designation, the thickness, the roof plan and the method of fixing the covering with your enquiry. Below we show how to separate the cost of the insulation from the cost of the connections to the membrane or roofing felt, and which documents to gather in order to assess the real saving offered by the proposed variant.

Matt facing and pale insulation core, illustration for the BauderPIR M/MF guide — Izoprofil.com

The subject of the purchase must be unambiguous

Before comparing prices, confirm the correct lambda and the method of connecting M or MF to the covering. Material and fixing compatibility should be assessed by the designer or the person responsible for the adopted roof system.

The correct product and the scope of its data

The BauderPIR M/MF specification must describe the product itself, not just the type of plastic. The PIR core has mineral fleece on both faces, the family format is 1200 × 600 mm, and M and MF differ in the shape of their edges. The Polish data sheet for M states λD 0.026 W/(m·K) for 80 mm up to below 120 mm, so this is not a constant lambda of 0.022. The documentation specifies at least 120 kPa in the compression test and fire reaction E. In the order, the full name BauderPIR M/MF replaces generic polyurethane boards; the properties of the complete board also include the facings, and installation means factory-made boards in a defined layer arrangement.

An identical basis of calculation

At 75 m², a 100 mm layer is 7.50 m³, and 120 mm is 9.00 m³. However, the difference in volume does not determine the difference in the BauderPIR M/MF price: the rates for specific thicknesses, packaging and cutting are read from the offers being compared, and the lambda of the M variant depends on the thickness. A list of thicknesses, facings and edges brings order to the pricing, so that the figures describe the same intended execution.

In BauderPIR M/MF, the unit of comparison is determined by the thickness of the M variant, because the lambda depends on it. It must be read together with the condition that the mineral facing is compatible with the adopted system. The documentation for the specific thickness of M or MF and for the connection to the covering shows what the assumption relates to. A list of parameters with thickness, facing and edge ensures that the price relates to the variant actually required.

What changes the cost of the solution

Maintaining the designed facing and selecting the required thickness is a different scope of work from changing the entire verified build-up after a fresh comparison. For BauderPIR M/MF, the consequences of both decisions in the area of the fleece beneath the waterproofing layer must be set out. The board with the mineral facing must not be calculated using the lambda of the aluminium variant, because the prices then relate to different assumptions. Differences in the cross-section are confirmed by the specialist who approves the compatibility of the insulation with the covering; only then does choosing the more favourable item make sense. The scope is organised by a schedule of parameters covering thickness, facing and edge, linked to the selected solution.

Labour hidden in the joint

A straight profile on M and a milled profile on MF mean different edge preparation, so labour costs may differ. With BauderPIR M/MF, the actual material surface is the matt mineral fleece, and the way it is sealed affects the scope of work. The bidder should describe the fleece on both surfaces, the correct edge profile and acceptance. A waterproofing covering compatible with the mineral facing must not appear as an unplanned extra charge; the area of the fleece beneath the waterproofing layer should be listed separately if it requires work different from the main field.

Transport, stock and preparation

Base the M/MF order on the bill of quantities for the boards and the specified method of installing the covering. Enter the acceptance of the insulation surface and its protection until the roof is completed in the schedule. If the alternative offer requires a different thickness or edge, re-check the levels, cut-offs and materials for terminations.

Conditions for accepting the final quote

Before covering, record the M or MF designation and the condition of the facings, and confirm compatibility with the waterproofing in the documentation of the adopted assembly. The costs of changes to flashings should be agreed before the alternative delivery is accepted. The comparison ends with a complete roof with the required function, not with the rate for the insulation.

7 branches. Materials closer to your project.

Izoprofil.com map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project