Which documents should you keep after insulation work?

At a glance

After completing the thermal insulation, it is worth keeping the documents that show what was actually installed and where. An invoice alone usually does not describe the entire build-up. Declarations, labels, the design, photographs and records of acceptance inspections and changes will prove useful. Such a set makes later renovation, assessment of a defect and selection of materials for repair easier. An invoice may contain an abbreviated name and the general quantity of polystyrene. It does not always allow all parameters, the batch number or the place of application to be determined. After a few years, the same trade name may lead to a different version of the documentation. It is therefore worth keeping the data relating to the actual delivery. The proof of purchase is still an important part of the set.

EPS board, ring binder, label and pencil during sorting of documents after purchase

Why is an invoice not enough?

It links the material with the supplier and the purchase date. However, supplement it with the approved order and the delivery document. If part of the packs was replaced, also keep its confirmation. The documentation should show the final state, not only the first planned specification.

What material data should be kept?

Keep the declaration of performance and the technical data sheet specific to the EPS used. Attach legible photographs of the labels of each grade and of the relevant batch markings. It is worth keeping the files, not just the web address. The structure of the website or the place where the document is published may change, even though the building will still be in use.

The label helps link the declaration to the material. Record the thickness, format, lambda and the properties needed for the given application. Do not fill in missing parameters on the basis of another product. If the manufacturer explained a discrepancy, keep the reply together with the corrected document and the original photograph of the label.

For an ETICS façade, also collect the documentation for the system used and its components. Information on the adhesive, the mesh, the fixings and the render may be needed. The EPS board does not describe the properties of the complete façade. This is particularly important for later repair of a section or a change of the finishing layer.

How can it be shown where a given variant was installed?

Prepare a simple plan divided into zones. Mark the façade, the plinth, the foundation, the floors and the roof separately. If several thicknesses were used, describe their extent. For the floor, it is also worth giving the sequence of layers. A single retained label will not automatically confirm the material laid in all parts of the house.

Attach photographs taken before covering to the plan. They should show the wider context and details of the joints. A photograph of the board alone without a recognisable location is of limited value. On the roof, a slope plan will be useful, and in the floor, the routing of services. Such information helps later when planning drilling and local exploratory openings.

Which acceptance inspections and changes are the most useful?

Keep the acceptance records for concealed works and the agreements concerning changes. It is worth having a record of the condition of the substrate, the insulation thickness and how important details were executed. If substrate tests, fixing tests or required installation tests were carried out, their results should be linked to the location and date.

Not every construction project requires an identical set of tests. Document those activities that were actually carried out and that are needed for the given solution. Do not add information later on the basis of assumptions. In the event of a deviation from the design, record who assessed it, what its scope was and which variant was ultimately used.

What should be kept for later operation?

Rules for use, cleaning and repair specific to the façade or roof will be useful. The documentation should indicate the elements requiring inspection, for example seals, flashings and drainage. EPS is usually covered, but its operating conditions depend on the condition of the outer layers and the joints.

Also keep the terms of the warranties granted and the final acceptance report, if you received them. Do not treat the warranty as a substitute for the maintenance instructions. After any significant repair, add the date, scope and materials used. Subsequent work will then be based on the actual condition, not on documentation from before the last renovation.

How should the complete set be organised so that it can be used?

Divide the files by building section, and within each group combine the design, materials and photos of the execution. The names should include the location and the date. It is worth keeping a copy in a second safe place. Access to the documentation must also be available to the person who will be responsible for later work on the building.

At the beginning of the collection, place a short final summary: type of insulation, thicknesses and locations. It does not have to be an extensive study. It is meant to quickly point to the right document when a question arises about the garage floor or the repair of the plinth. A well-described set saves more time than hundreds of disorganised phone photos.

EPS documentation is provided by manufacturers such as Polstyr, Sonarol, Austrotherm and Justyr. Keep the files corresponding to the installed product, its thickness and the designation on the label.

7 branches. Materials closer to your project.

Izoprofil.com map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project