PIR insulation
Floor costs with Kingspan Therma TF70: how to compare quotations
A quote for a Kingspan Therma TF70 floor is only comparable if all bidders assume the same finished floor level and the same scope of substrate preparation. The comparison must include offcuts and protection of the layer during subsequent works — without this, the figure does not describe the cost of a layer ready for the further execution of the floor. Therma TF70 is a PIR board for insulating heated and unheated floors, with a multilayer facing containing aluminium on both sides. In the enquiry, describe the floor with TF70 whose level must be matched to the doors and adjacent rooms. Agree the space for TF70, the screed and the final finish so that each bidder prices the correct variant and the same scope of application.

A precise request for quotation
Do not choose solely on the basis of a short commercial description: reducing one layer without analysing the cross-section may compromise the requirements of the entire floor. The compared offer should make it possible to achieve the required thermal resistance without inadvertently changing the level of finished transitions. Agree with the bidders the height of the available cross-section, the planned finish and the levels at doors and stairs, so that everyone prices a similar task.
A comparable thermal result
When comparing TF70 offers, enter two variants separately: 80 mm with RD 3.60 m²K/W and 100 mm with RD 4.50 m²K/W. Therma TF70 has a declared conductivity of 0.022 W/(m·K). These resistance values assigned to the thicknesses serve as a reference point when checking the thermal equivalence of the proposed polyurethane boards.
Keep the TF70 resistance separate from the calculation of heat flow through the complete ground floor, so that the price difference does not arise from different thermal assumptions. The cheaper item may mean a different result when the way heat flows through the ground is not described solely by the inverse of the insulation resistance. Before assessing the amount per square metre, compare the floor variants while maintaining the correct thermal method and actual geometry. Add to the offers table the TF70 thickness, the catalogue resistance and the connection of the floor to the perimeter of the heated building; only then can the price difference be linked to the parameters.
What increases the scope of works
Delivery of Therma TF70 standardly includes 1200 × 600 mm boards with square edges. When pricing installation, indicate unevenness of the existing substrate, the routing of services and the floor perimeter. At each of these points, adequate support must be provided for the boards.
The cost of laying TF70 also depends on substrate repairs and how installation grooves are resolved. The board must not rest accidentally over a void simply because it is rigid. The cutting plan at walls and the arrangement of joints relative to pipes allow the quantity of full boards and the allowance to be determined. In the enquiry, separate the supply of insulation from the works ensuring its even support.
Product parameters and delivery conditions
When replacing Therma TF70, the quoted floor must still transfer the load from the intended item of furniture or equipment. The assessment covers the screed together with the other load-distributing layers. The data for TF70 itself — a minimum of 120 kPa at 10% deformation and reaction to fire class E — do not on their own describe the service load of the finished floor.
A cost comparison for a floor over TF70 should include the screed and the other layers that transfer the intended service load. The CS120 figure alone does not define the permissible deformation in the finished floor. The data on service load and support dimensions must allow a layer that distributes the forces over a larger area to be selected; in both solutions, the requirements for the durability of the floor finish must also be maintained. A similar name or facing does not confirm that these conditions are met.
Completeness of the offered solution
The Therma TF70 facing does not seal the junctions at walls or at pipe penetrations — protective and separating layers specified for the given cross-section are required. In the request for quotation, state the point where the floor insulation meets the covering layers at the wall and at the pipe penetration, so that the contractor prices this junction and not only the laying of the boards.
A line item for protective and separating layers around the floor perimeter that is omitted from the quotation is not a saving if the design provides for them to be installed. For “polyurethane foam”, ask what scope of protection the line item covers — a laminate on a board does not on its own seal all the gaps in the layer. Before agreeing the price, confirm the arrangement of the protective layers, how they are joined at the perimeter, the protection of the service penetrations and who is responsible for installing the protection; do not assign the function of the entire waterproofing to the surface of TF70.
Calculation of the entire building element
Purchasing Therma TF70 requires establishing the finished floor level and the insulation thickness. A quotation covering substrate preparation, cutting, protection and edge joints provides a reference point for the “polyurethane insulation” item — compare it across the full scope of works, from preparing the substrate for TF70 to handing over the insulation for the subsequent layers.
In the TF70 bill of quantities, include cutting, material protection and substrate preparation so that the purchase price is related to the scope of finished works. At a similar rate per board, the difference between offers may stem precisely from omitted preparatory works. The comparison then allows offers leading to a floor of the required height and with identical preparation to be compared. When approving the order, check the number of full boards, the scope of substrate levelling and responsibility for protection during subsequent works, and record each excluded item as a separate cost.
For TF70, specify to bidders the same target floor level and scope of substrate preparation. Without this, one quotation may omit the works needed to lay the boards. Include separately the protection of the layer during subsequent works. Material damaged before the screed yields no benefit from a lower purchase price. The comparison should lead to an identically prepared floor that can be handed over to the next team.