Choose a material

Roofing sheets

Sandwich panels

PIR insulation boards

XPS

Accessories

Fencing

PIR insulation

IKO enertherm ALU TG: when to include the tongue-and-groove joint in the cost calculation

At a glance

With ALU TG, the price is determined not only by the area of the field but also by the planned cutting layout. The factory tongue and groove is present on full boards, while a cut edge no longer has it, so joints at the edges must be allowed for separately. It is worth attaching to the enquiry a row plan marking the cut edges, the width of the last strip and the positions of the joint ends. This allows the supplier to price the insulation joined with the factory tongue and groove together with the actual scope of cut pieces, and not just the straightforward field.

Upright board with a red grid and profiled edge, illustration for IKO enertherm ALU TG — Izoprofil.com

The subject of the purchase must be unambiguous

Joints between full boards and cut pieces must maintain the continuity of the layer, which is why the scope of ALU TG is determined before quotations are compiled. Any doubts regarding the cutting plan and laying are resolved by the coordinator, not by the final amount.

The correct product and the scope of its data

In the IKO enertherm ALU TG specification, not only the PIR core but also the aluminium laminate and the tongue-and-groove edge must be described, because only this combination corresponds to the name checked at acceptance. For the family, lambda 0.022 W/(m·K) and compression of at least 175 kPa are given; the reaction to fire is F, and B-s2,d0 refers to a specific end use. The TG profile does not act as a structural connection or as standalone waterproofing, and after cutting the edge loses its factory shape. The mere term polyurethane boards is not sufficient when comparing quotations.

A uniform basis for the calculation

For 95 m², a 100 mm layer amounts to 9.50 m³, and 120 mm to 11.40 m³. The difference in volume does not translate directly into the price of ALU TG: rates for thicknesses, packaging and cutting come from quotations. The price of a board is therefore not multiplied proportionally to the thickness; the tongue-and-groove profile, the laying direction and the terminations also matter.

In IKO enertherm ALU TG, the scope is determined by the tongue-and-groove profile, which disappears from the edge after the board is cut. Before pricing, the points where the factory profile is lost must therefore be marked on the drawing, and a row plan indicating the cut edges must be attached. Only on this basis will the cutting plan with the laying direction and termination details show whether the quotation actually covers the required variant.

What changes the cost of the solution

Changing the width of the first row for a more favourable final cut leads to a different scope of work than a full first row with a separate perimeter solution. With IKO enertherm ALU TG, the effects of both decisions on the cut edge without a preserved factory tongue must be described. The coordinator of cutting and laying ALU TG confirms the differences in cross-section; without this, no cut can be regarded as an element with a complete interlock, nor can items be compared financially.

Labour hidden in the joint

The labour intensity of ALU TG includes fitting the factory tongue and groove and finishing the edges that lost their profile during cutting. Do not assume that the contractor will recreate the interlock on every cut piece. In the quotation, indicate the method of terminating the perimeter, the sealing required by the system and the scope of inspection before it is covered.

Transport, allowance and preparation

The substrate for ALU TG should allow the boards to be fitted without forcing the joints; any levelling should be priced separately. The quantity ordered is justified by the row and cut plan, not by the area of the field alone. If you change the format or layout of the boards, recalculate the utilisation of full sheets and the method of closing the perimeter.

Conditions for accepting the final quote

At acceptance, compare the ALU TG marking with the delivery and check the fit of the interlocks and the execution of the cut edges. The label confirms the variant, while the inspection of the joints confirms the quality of laying. Settle the additional cuts and seals on the basis of the approved plan before the insulation layer is closed.

7 branches. Materials closer to your project.

Izoprofil.com map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project