SOPREMA PIR boards: how to read a quote for a complete roof

At a glance

A roof with BLUE A boards requires a quote that covers not only the field of the covering but also the flashings at rooflights — without them the board quantity matches the surface area, but the scope of sealing remains unclear. In EFYOS BLUE A, sealing the vapour control layer to the vertical rooflight upstand is critical, which is why pricing the easy field area alone is not enough. Attach a rooflight detail to your enquiry with a separate line for each protective layer and describe the expected result of a complete roof: vapour control layer, thermal insulation and covering. A surcharge revealed after the insulation has been laid is not a reliable point of reference for a second, complete quote.

Blue facing on a pale core, illustration for thermal insulation in a SOPREMA system — Izoprofil.com

The subject of purchase must be unambiguous

The survey must cover the position of all layers at the base of the rooflight so that the supplier does not have to guess the scope. In the order, separate thermal continuity, air tightness and rain protection. The junctions are clarified by the coordinator responsible for executing all roof layers before the quotations are compared by final amount.

The correct product and the scope of its data

In the layer arrangement described, the thermal layer is EFYOS BLUE A: a PIR core enclosed by aluminium facings. For this board the manufacturer states λD = 0.022 W/(m·K), CS(10/Y)120 and fire reaction E. These are the data of one product, so they do not determine the properties of the adhesive, covering, vapour control layer or the classification of the entire roof assembly — the roof design assigns a separate function to each of these elements. In the order the full name EFYOS BLUE A is essential, because generic “polyurethane boards” do not identify this product. The rigid PIR foam core is responsible here for insulation, and the aluminium facings contribute to the properties of the finished board; installation consists of laying the factory-made boards in the specified layer sequence.

A uniform basis of calculation

In quotations for a roof with EFYOS BLUE A, separate the insulating material from the work at the skylights: separate items for the vapour control connection, PIR cut-offs and the upstand of the covering. The absence of one item does not prove a cheaper technology — the cost may return as a later surcharge or go to another crew. Agree the scope before comparing final amounts.

Lambda 0.022 W/(m·K) for EFYOS BLUE A defines the conduction of heat through the product, whereas the tightness of the junctions depends on the execution of the roof. On the skylight section, show the vapour control, thermal insulation and waterproofing separately. The cost estimate should assign to each crew its own terminations and take into account access for checking the seals before the next layers are laid.

What changes the cost of the solution

Repairing a missing connection at the rooflight is a different scope of work from increasing the thickness in the central field of the roof slope. For EFYOS BLUE A, the effects of both decisions at the connection between the vapour control layer and the rooflight upstand must be set out. In the comparison, the foil on a single board cannot be regarded as an airtight vapour control layer for the whole roof, because then the prices relate to different assumptions. Differences in the cross-section are confirmed by the coordinator for the execution of all roof layers; only then does choosing the financially more favourable item make sense. The final scope is organised by a single schedule of materials linked to the cross-section and details of the selected solution.

Labour hidden in the joint

Merely pushing the PIR boards up to the rooflight does not ensure continuity of the vapour control layer. In the offer, indicate the materials and labour needed to connect it to the vertical upstand and to turn up the waterproofing. Acceptance should take place with the detail exposed, with photographic documentation and identification of the person responsible for each connection.

Transport, stock and preparation

Separate the preparation of the substrate, the delivery of the boards and the execution of the successive roof layers into specific offer items. The schedule of materials at the rooflights should correspond to the detail drawings. If the insulation thickness or the position of the bases changes, the cuts and terminations must be checked again; surplus material does not replace such a correction.

Conditions for accepting the final quote

At acceptance, compare the marking of the delivered boards with the order, and compare the photographs of the connections with the rooflight detail. These are two different checks: the identity of the product and the quality of execution. Before the works, establish how changes at the vertical upstands will be settled and who will confirm the continuity of the layers before they are covered.

7 branches. Materials closer to your project.

Izoprofil.com map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project