PIR insulation
Eurofloor prices versus the cost of a complete insulated floor
A cheaper square metre of insulation does not necessarily mean a cheaper floor if it requires changing levels or more work. Recticel Eurofloor is worth comparing at the same thermal performance. Substrate levelling, screed, services and waste must be calculated separately. Recticel Eurofloor has a rigid PIR foam core and a multi-layer gas-tight foil with a printed grid on both sides. The manufacturer intends it for thermal insulation of floors, including those with underfloor heating. An enquiry about PIR boards should describe a floor with a heating installation placed in the layers above the thermal insulation. Eurofloor must be placed in the correct floor build-up together with the planned heating installation.

What the quotation must identify
Do not choose solely on the basis of a short commercial description, because the printed grid helps with measuring out but does not determine the installation spacing on the designer’s behalf. The offer being compared should allow the choice of insulation to be linked to the floor height and the routing of the planned heating. Agree with the bidders on the layer build-up from the substrate to the floor finish and on the layout design for the heating elements, so that everyone prices a comparable task.
An equal thermal basis for comparison
For comparing offers, use a lambda for Eurofloor of 0.022 W/(m·K), valid for thicknesses of 20–100 mm. The data sheet for the 100 mm board states RD 4.50 m²K/W — enter this value in the schedule alongside the floor geometry so that no variant is calculated on different thermal assumptions.
For comparison with the 100 mm thick Eurofloor board, use the declared RD of 4.50 m²K/W, but bear in mind that this applies to the insulation layer and not to the entire floor on the ground. The reciprocal of the board’s RD is not a ready-made U-value for the building element, so the cheaper variant may produce a different thermal effect under different calculation assumptions. In the offers table, record the RD from the data sheet, the floor geometry and the layers and joints included in the calculation — only then can the price difference be related to the parameters.
Board format versus actual waste
Determine the cutting layout and the number of packs according to the 1200 × 1200 mm format with straight edges given in the current Recticel Eurofloor data sheet. Arrange the square boards on the room plan with obstacles in the substrate, and derive the allowance from this plan, not from the pack area.
Base the cutting plan on the current 1200 × 1200 mm format with straight edges and on the actual dimensions of the room and of the obstacles in the substrate; the allowance must result from this plan, not from the pack area alone. An older description of a different format may change the number of packs required, so prepare the cutting layout for the variant actually supplied. In the pricing of this detail, take into account the format on the label, the support at the joints and the arrangement of the final strips at the walls.
Parameters required for application
In the specification, replace the mere phrase ‘PIR board’ with the Eurofloor declaration: CS(10/Y)120, where CS relates to 10% deformation in the test, and reaction-to-fire class F. Only on this basis should you compare the alternatives proposed in place of the selected model.
For an alternative, check where heavy elements with small footprints will stand on the finished floor — the screed over Eurofloor must distribute the load in accordance with the requirements of the entire floor in use. The mere similarity of the name or facing does not allow 120 kPa to be converted into a permissible furniture weight without assessing the floor layers. Obtain data from the supplier to verify serviceability deformation and system loading, and before accepting the saving, compare the dimensions of the supports, the requirements for the screed and the loads in the given room.
Layers that should not be omitted
The gas-tight facing of Eurofloor makes it harder for vapour to pass through the board, but it does not close the joints between adjacent boards. Therefore, in the specific floor cross-section, it is necessary to indicate where the moisture-proof layer runs and where the separating layer runs, and whether both are needed.
In the floor cross-section with Eurofloor, indicate the separating layer and the moisture protection, because the foil on the board limits diffusion, but the joints between the boards interrupt its continuity. Regarding auxiliary materials, ask what scope of protection is covered instead of treating an omitted layer as an unnecessary expense. Before the final price, confirm the type of protective layers, the connections at the perimeter, the condition of the substrate and the responsibility for the protections.
Acceptance in line with the scope of the order
The Eurofloor order should specify the insulation thickness resulting from the design and the method of constructing the floor. Offcuts, protection of the laid boards and the layers laid above the insulation are added to the quotation.
For the floor insulation quotation, include offcuts, coverings and protection of the boards during installation and screed works. Acceptance of the laid Eurofloor before handing the surface over to the next team allows the cost to be assigned to a completed scope, because damage after the insulation has been covered is difficult to attribute. In the order, check the bill of quantities for the boards, the auxiliary layers and the handover record for the substrate, and record each excluded item as a separate cost.
In the Eurofloor order, the current format and the number of boards in the supplied packaging must be established. An older product description can lead to an incorrect bill of quantities. It is also worth including works that protect the insulation between the laying stage and the execution of the screed. Omitting them from the offer does not mean they cease to be necessary. The scope and responsibility for handing over the layer should be clear before the next team enters.