Choose a material

Roofing sheets

Sandwich panels

PIR insulation boards

XPS

Accessories

Fencing

PIR insulation

Buying Thermano Compact: when a smaller format reduces installation costs

At a glance

A smaller board does not have to mean a lower price per square metre, but it can reduce waste and working time on details. This is how Thermano Compact should be assessed. The calculation should cover the actual cutting layout as well as the cost of delivery and handling of the material at the specific location. Thermano Compact is a PIR board in the 600 × 1200 mm format, with a multi-layer facing containing aluminium. The smaller format is an important practical feature. An enquiry about PIR boards should describe a small working area into which a 600 × 1200 mm board is easier to bring. The Thermano Compact format must be matched to the size of the working area and the available transport route.

Rectangular white casing with a round opening and visible layers, accompanying the Thermano Compact guide — Izoprofil.com

What the quotation must identify

Do not choose solely on the basis of a short commercial description, because the convenient handling of a smaller board does not determine the correctness of the entire installation. The quotation being compared should make it possible to organise work on a small section without abandoning the designed layer build-up and joints. Agree with the bidders on the dimensions of the installation area, the access width and the planned position of every joint, so that everyone prices a similar task.

What result is worth paying for

In the Thermano Compact specification, state the declared lambda of 0.023 W/(m·K), and specify the thickness on the basis of the required thermal resistance and the location within the building element. The coefficient alone does not determine the selection — the geometry of the detail is also needed.

A narrow insulation strip whose thickness is limited by an existing building detail requires an assessment of the resistance of the insert together with the geometry of the materials surrounding it. The influence of the strip on the thermal bridge depends on that surroundings, so a cheaper item may produce a different effect. Add the width and thickness of the insert and the continuity of the thermal insulation in the adjacent sections to the quotation table; only then can you link the price difference to the parameters, without transferring the R result to the entire junction.

Covering, cutting layout and labour

The BASIC and TOP variants differ in their edge: after cutting, the groove may disappear from one side, so describe in the specification how the new joint will be formed. This determines whether the cut element retains the function planned for the given variant.

After shortening a TOP board, part of the factory overlap disappears, so the joint between the retained groove and the new straight edge must be planned, and the material allowance based on the actual cutting layout. The packaging area alone can be misleading, because utilising offcuts requires support and closing the new joint. Before determining the number of packages, match the cutting layout to the direction in which the pieces are laid and check the position of the groove on each element and the stability of the strip at the perimeter.

Is the proposed variant equivalent?

When taking delivery of Thermano Compact, check the thickness appropriate to the compression declaration: up to 30 mm, at least 150 kPa at 10% deformation is stated, and from 40 mm — 200 kPa. These are not load-bearing capacity values for the finished floor or detail. The second, independent piece of information in the documentation is the product’s reaction to fire class E.

For a substitute, compare the declared CS150 up to 30 mm with CS200 from 40 mm and assign the CS value to the thickness shown on the board marking. A similar name or facing is not enough, because the appearance does not show the declaration range. The supplier should present data for assessing the pressure on the detail for the exactly selected variant; before accepting the savings, match the thickness from the label, the contact area and the distribution of the anticipated load.

Delivery and protection of the purchased material

The aluminium layer on the Thermano Compact board does not exempt you from providing moisture protection. In a small PIR insert, the flashings and the joints with the window, wall or substrate are decisive, which is why the quotation should cover the sealing of all sides of the detail, not only its middle.

For a PIR insert adjacent to the substrate and a flashing in a place exposed to water, ask about the protection of the entire detail, not only the face. The item “polyurethane foam” is often incomplete: the facing remains undamaged, and water enters through an unclosed side. The auxiliary materials should therefore cover the ends of the insert, and before the final price, confirm water drainage, the condition of the flashing, the connections on all sides and responsibility for the protections.

Acceptance in line with the scope of the order

For a Thermano Compact order, calculate how many boards can be cut into the required pieces rather than relying on the area of the recesses. A narrow strip left after cutting may fit none of the other junctions, so its measured area cannot be counted as usable coverage.

Compare insulation works across the full scope of works, analysing a set of several small fragments whose combined square metreage does not show the number of full boards. Arrange the cut pieces on the 600 × 1200 mm format before purchasing packs, in order to relate the cost to the completed works. Narrow remnants may not fit the next location despite matching thickness, so when ordering check the cutting sketch, the number of full boards and the use of the remaining fragments, and record each excluded item as a separate cost.

With a small order of Thermano Compact, the cost of one additional pack can account for a large share of the total purchase. It is therefore worth preparing an actual cutting plan. An unused fragment is not a saving if it does not fit any planned location. Do not assume either that a smaller format always produces less waste. What decides is the arrangement of the required shapes and the position of the edges required in the detail.

7 branches. Materials closer to your project.

Izoprofil.com map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote