Choose a material

Roofing sheets

Sandwich panels

PIR insulation boards

XPS

Accessories

Fencing

PIR insulation

How to compare offers for PIR boards without hidden gaps in the bill of quantities

At a glance

Two offers for PIR boards can have the same thickness and a completely different scope. A reliable comparison should cover the parameters, the facing, the accessories and the installation. It is also worth checking the coverage area, transport and preparation costs. Only then does the price become useful information. PIR boards can look similar yet have different facings, strength and intended use. Before purchase, a current technical data sheet, a declaration of performance and installation instructions are needed. The product variant should be described without abbreviations that cause confusion. In the enquiry, it is worth stating the full board specification and the conditions in which it will work.

Three stacked boards with silver facings and pale cores, accompanying the purchasing guide — Izoprofil.com

The document describes the correct variant

The seller should confirm the facing, the edge and the scope of the documentation. If they propose a different variant, the differences must be pointed out before ordering. A similar name or a photograph is not enough. Such identification helps avoid a situation in which a favourable price applies to a material that does not match the adopted method of installation.

Comparable scope of offers

Compare offers for the same task, because thickness alone does not give equal thermal resistance, and an identical lambda value does not settle whether the facing is suitable for the adhesive. So compare function and the expected thermal effect, not just the price per square metre.

The common point of comparison should cover the thermal effect and the function of the entire building component. The same number of centimetres can give a different resistance, and the same resistance does not confirm that the surface is compatible. It is worth taking both criteria into account. Additional layers needed for one variant must be added. As a result, the final price refers to a solution that can actually be implemented, and not to an isolated catalogue item.

Format and organisation of delivery

Choose the format to suit the place of installation: a large one reduces the number of elements, a small one makes it easier to carry in narrow spaces and to work on a divided surface. Add transport and unloading to the schedule, because they change the total cost.

For a small delivery, transport and unloading can form a noticeable part of the cost. You should check access and the scope of the carrier’s service. It is worth establishing who moves the material to the installation location. A larger format may require different conditions from a small one. Comparing these items before purchase avoids an additional expense that was not visible in the price per square metre of the board.

Cutting plan and edge connections

Cutting to size allows full boards to be used in repetitive locations and reduces waste. A straight edge, an overlap and a tongue-and-groove joint require adjacent elements to be matched, so determine the gross area and the actual coverage unambiguously.

The quantity schedule should distinguish external dimensions from the usable coverage area. The profile and the type of joint can be relevant to the bill of quantities. The allowance must then be linked to the cutting plan. A single percentage added to every roof or floor does not describe the number of openings and corners. It is worth keeping the calculation so that material consumption and leftovers can later be assessed without ambiguity.

Materials at the interface between layers

When compiling quotations, the critical points are the interfaces: the tape matched to the facing, the adhesive for the substrate, the fastening to the structure. The items for tapes, adhesive and fastenings must correspond to the same scope of work, otherwise the comparison ceases to be reliable.

Accessories should be compared in the same quantity and function. A roll of tape of a different width or an adhesive intended for a different joint does not constitute an equal line item. Conformity with the facing and the substrate should be stated. It is also worth including surface preparation. Such a scope makes it possible to assess the real cost of the joints that determine how the entire insulation layer performs.

Cost of use and subsequent maintenance

The price of the boards alone does not exhaust the cost of the building element. The comparison includes substrate preparation, labour, offcuts, supplementary components and protection of the works. Separately, it is worth recording how damage or a non-conforming delivery is reported.

The terms for accepting the material should be agreed before delivery. They should specify how damage, a non-conforming variant or a missing quantity is to be reported. The material is best checked before it is used and covered. A clear procedure makes it easier to resolve a problem without stopping the entire project. The price is of practical significance together with the deadline, completeness and the possibility of obtaining a product matching the order.

Example of checking the quantity of material

Scale check: at 195 m² and a board of 1200 × 600 mm, pure geometry indicates at least 271 pieces, and for 2400 × 1200 mm at least 68 pieces. This is not an order — the calculation omits offcuts, the edge profile and the actual coverage area, so it requires correction according to the cutting plan and the product requirements. Order by designation, not by appearance: the polyurethane insulation in the board has its own purpose and installation technology, while polyurethane foam for gaps is a different component — the offer should separate the boards from the sealing materials.

7 branches. Materials closer to your project.

Izoprofil.com map of seven branches offering sandwich panels, PIR boards and sheet metal
  • SEROCK — Dzierżenin 34 E [mapa]
  • BŁONIE — ul. Sochaczewska 138A [mapa]
  • RADOM — ul. Grobickiego 8 [mapa]
  • ŁÓDŹ — Natolin 8 [mapa]
  • OLSZTYN — Barczewo, ul. Prosta 9 [mapa]
  • WROCŁAW — ul. Jerzmanowska 10C [mapa]
  • GORZÓW WLKP. — ul. Zielona 33/34 [mapa]

Check prices and availability: +48 500 409 109

Free quote

Materials for your project